featured projects
CHUGWATER, WYOMING
8000 ft
Our team completed a high-volume drilling program for a new wind farm development in Chugwater, Wyoming. Across the expansive project site, we drilled 50-ft borings spread strategically throughout the terrain, totaling 8,000 feet of drilling in October 2025. These subsurface investigations provided essential data for turbine foundation design and terrain suitability.
Large-Scale Project Coordination
Efficient Multi-Rig Field Operations
Detailed Subsurface Logging
Renewable Energy Infrastructure Support


FLASHER, NORTH DAKOTA
1500 ft
We supported a major transmission line and substation build near Flasher, North Dakota. Our crew drilled 1,500 feet in August 2025, delivering precise soil and subsurface data needed for structure placement and long-term grid stability.
Utility & Energy Sector Drilling
Accurate SPT & Soil Sampling
Foundation Load Evaluation
Timely Delivery Under Tight Schedules
NORTH DAKOTA STATE PARKS
320 ft
Partnering with Braun Intertec, our team completed drilling across five separate state park sites, totaling 320 feet of geotechnical borings. This work supported the design of new storm shelters, requiring accurate subsurface profiles to ensure safety, durability, and compliance.
Multi-Site Project Management
ASTM-Compliant Sampling
Collaboration with Engineering Firms
Reliable Data Collection for Public Infrastructure


WATFORD CITY, NORTH DAKOTA
280 ft
For TC Energy, we drilled 280 feet and installed vibrating wire inclinometers near Watford City in November 2025. These instruments allow continuous monitoring of ground movement to ensure pipeline and facility safety.
Geotechnical Instrumentation Expertise
Precision Drilling for Deep Installations
Oil & Gas Sector Compliance
Accurate Data Infrastructure Setup