featured projects

CHUGWATER, WYOMING

8000 ft

Our team completed a high-volume drilling program for a new wind farm development in Chugwater, Wyoming. Across the expansive project site, we drilled 50-ft borings spread strategically throughout the terrain, totaling 8,000 feet of drilling in October 2025. These subsurface investigations provided essential data for turbine foundation design and terrain suitability.

  • Large-Scale Project Coordination

  • Efficient Multi-Rig Field Operations

  • Detailed Subsurface Logging

  • Renewable Energy Infrastructure Support

FLASHER, NORTH DAKOTA

1500 ft

We supported a major transmission line and substation build near Flasher, North Dakota. Our crew drilled 1,500 feet in August 2025, delivering precise soil and subsurface data needed for structure placement and long-term grid stability.

  • Utility & Energy Sector Drilling

  • Accurate SPT & Soil Sampling

  • Foundation Load Evaluation

  • Timely Delivery Under Tight Schedules

NORTH DAKOTA STATE PARKS

320 ft

Partnering with Braun Intertec, our team completed drilling across five separate state park sites, totaling 320 feet of geotechnical borings. This work supported the design of new storm shelters, requiring accurate subsurface profiles to ensure safety, durability, and compliance.

  • Multi-Site Project Management

  • ASTM-Compliant Sampling

  • Collaboration with Engineering Firms

  • Reliable Data Collection for Public Infrastructure

WATFORD CITY, NORTH DAKOTA

280 ft

For TC Energy, we drilled 280 feet and installed vibrating wire inclinometers near Watford City in November 2025. These instruments allow continuous monitoring of ground movement to ensure pipeline and facility safety.

  • Geotechnical Instrumentation Expertise

  • Precision Drilling for Deep Installations

  • Oil & Gas Sector Compliance

  • Accurate Data Infrastructure Setup