
SERVICES
Environmental Drilling
Phase II ESA, monitoring well installation, soil sampling per state DEQ.
WHAT IT IS
Phase II Environmental Site Assessments, monitoring well installations, and soil sampling for environmental consultants. Decontamination procedures between borings; soil and water samples handled to chain-of-custody standards.
We've worked closure programs at gas stations, light industrial sites, and brownfield redevelopments. Every state in our corridor has different DEQ paperwork; we know which forms each one wants.
DELIVERABLES
- Phase II ESA borings (typical 4–12 per site)
- Soil samples per EPA SW-846 / state DEQ
- Groundwater monitoring wells (2-inch / 4-inch PVC)
- Chain-of-custody documentation
- Decontamination between holes (steam clean + rinse)
EQUIPMENT
Rigs we run for this work.

Diedrich · limited-access-mounted
550x 4x4 Buggy Rig
Max depth: 350 ft
SAMPLE DELIVERABLE
See what a environmental drilling report looks like.
Every boring closes with a logged, sampled, defensible report. Below is a redacted boring log so you can see the format before the rig hits your site.

Want the same report format on your project? Request a quote.
WHO WE DO IT FOR
Industries we serve with this work.
FAQ
Common questions
Do you handle hot-zone work / known contamination?
What about cross-contamination between borings?
READY TO TALK
Need environmental drilling on your site?
Tell us where the project is and when crews need to be on the ground. We'll be in touch.