
SERVICES
Instrumentation
Piezometers, inclinometers, monitoring wells installed and commissioned.
WHAT IT IS
Vibrating-wire piezometers, inclinometer casings, and monitoring well installations. We install per spec, develop wells per the engineering plan, and hand off baseline readings before we demobilize.
Commissioning includes a baseline data sheet, install photos, and as-built coordinates. If the engineer of record wants ongoing reads, we can come back on a schedule. Or you can take it from there.
DELIVERABLES
- Vibrating-wire piezometer installation
- Inclinometer casing + baseline reading
- Monitoring well installation (per state DEQ specs)
- Well-development log
- As-built install record + photos
EQUIPMENT
Rigs we run for this work.

CME · truck-mounted
CME 75 (Truck-mounted)
Max depth: 350 ft

CME · limited-access-mounted
550x 4x4 Buggy Rig
Max depth: 350 ft
SAMPLE DELIVERABLE
See what a instrumentation report looks like.
Every boring closes with a logged, sampled, defensible report. Below is a redacted boring log so you can see the format before the rig hits your site.

Want the same report format on your project? Request a quote.
WHO WE DO IT FOR
Industries we serve with this work.
PROJECTS RUNNING THIS SERVICE
Real footage. Real numbers.
FAQ
Common questions
Can you install monitoring wells under state DEQ permits?
Do you do long-term piezometer reads, or just install?
READY TO TALK
Need instrumentation on your site?
Tell us where the project is and when crews need to be on the ground. We'll be in touch.
